Bored? Need something to do for several hours? I suggest...
The blue ball factory.
When you're bored with that, there's...
Another blue ball factory.
Subscribe to:
Post Comments (Atom)
All material on these pages is ©2003-2010 by Joe Belland, Dave Belland, Tom Adams, Cari Burud and/or Paul Harold except for the stuff that we blatantly stole from other sources. All rights reserved.
It takes a ball in the first factory about 4'45" to make a complete cycle in the main loop. However there is more than one loop. There's at least one other loop which is not connected with the main loop.
ReplyDeleteThe second factory, being larger and more complex takes approximately 8'15". As far as I can tell, it is only one loop and a ball will eventually go through all parts.